Winning Locker Room Design

Winning Locker Room Design

Wenger provided the University of Minnesota with easy-to-clean lockers that also give players a place to relax and unwind after a game or practice.

“Our previous lockers looked outdated and it was also time to update their functionality,” says Andy Harris, assistant director of Football Equipment at the University of Minnesota in Minneapolis.

“We wanted a locker room that gives the ‘wow factor’ every time players walk in,” explains Harris.

“Wenger did an outstanding job translating our goals into reality,” recalls Harris. These unique lockers include several new features developed specifically for this project. Ventilation ducts integrated into each locker’s foot locker and topper unit are tied into the main HVAC system to accelerate equipment drying.

Sanitation is a “huge issue” for locker rooms, according to Harris. Drying out everything in a timely manner is important.

Cleaning the lockers is easy — all wooden surfaces feature an antimicrobial, polyester laminate finish that makes wiping them down simple and quick. This finish material prevents bacteria and viruses from penetrating into the wood, helping reduce the spread of MRSA, colds or flu.

Aesthetically, the university’s maroon and gold colors are incorporated throughout the locker design. A padded seat, which doubles as the footlocker lid to help conserve valuable floor space, is also a GearBoss first.

To display player information or photos, each locker includes a built-in digital picture frame, enabling a player to customize his own locker’s appearance. Accent lighting provides visual highlights for certain locker elements, including an etched-glass door enclosing the topper unit that holds helmet and shoulder pads.

Harris says the locker room has become a comfortable place for players to relax. He concludes, “With the locker room’s open design and more locker space, everyone just feels more like part of the team.”

www.wengercorp.com

This article originally appeared in the College Planning & Management November 2013 issue of Spaces4Learning.

Featured

  • California School District Starts Construction on Public Safety Center

    The San Bernardino City Unified School District (SBCUSD) recently announced that construction has begun on a new public safety center that will house the district’s safety and security programs. According to a news release, the James Ramos Center for Public Safety will measure in at 17,140 square feet and contain the district’s Police Department, Office of Emergency Management, and cadet program.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • Clemson to Launch North America’s Largest College Campus Smart Parking Program

    Clemson University in Clemson, S.C., recently announced a partnership with smart parking and curbside management solutions provider eleven-x to launch a smart parking initiative for its population of 29,000 students and faculty, according to a news release.

  • Dallas ISD Debuts New Peabody Elementary School

    The Dallas Independent School District in Dallas, Texas, recently announced the completion of the new facility for George Peabody Elementary School, according to a news release. The district partnered with Pfluger Architects and REEDER Construction on the 70,807-square-foot replacement campus, which has the capacity for 550 students.

Digital Edition