The Fresh Food Company

CMH Architects

Project of Distinction Winner 2015 Education Design Showcase

The Fresh Food Company 

Project Fact Sheet

Facility Use: College/University 4-Year Institution
Project Type: New Construction
Category: Cafeterias/Food Courts/Dining Halls
Location: Tuscaloosa, AL
District/Inst.: University of Alabama
Completion Date: July 3, 2014
Design Capacity: 775 students
Enrollment: 36 students
Gross Area: 42,143 sq.ft.
Space per pupil: 48 sq.ft.
Site size: 3 acres
Cost per student: $19,945
Cost per sq.ft.: $366.00
Total project cost: $15,457,500
Building construction cost: $12,438,000
Furniture & equipment cost: $518,676
Fees and other: $1,354,820

Founded in 1831, the Tuscaloosa campus of The University of Alabama (UA) is the flagship school of the University of Alabama System. With an enrollment over 36,000 students, the University of Alabama has experienced continued growth for the last decade. To address the dining needs of this expanding student population, the campus master plan called for relocating the popular Fresh Food Company from the Ferguson Center Student Union to a new standalone building replacing the original 14,000 square-foot dining facility.

The Fresh Food CompanyTim Leopard, assistant vice president for Construction and Dan Wolfe, University planner and designer, led site selection. After considering several locations on the congested campus, a site was chosen at the corner of Hackberry Lane and Margaret Drive. The location was selected to draw students from the residential dining facilities on the north and south ends of campus and closely relate to the Student Union and the center of campus. This site for the Fresh Food Dining Building adjacent to the Shelby Engineering Quadrangle and the planned growth areas of east campus gives the facility the potential of serving dining needs well into the future.

During programming, Kristina Hopton-Jones, director of Food Services, and A.J. Defalco, director of Bama Dinning, presented the design team with a list of ambitious goals for the new Fresh Food Dining facility with a primary directive to deliver a vibrant “cool” restaurant quality experience that draws students from across campus. Design goals included:

  • Focus on quality of food service over quantity of space.
  • Be flexible and adaptable to accommodate a seasonal “all you care to eat” menu and restaurant services for breakfast, lunch and dinner with continuous and scalable operations from 7:00 a.m. to midnight
  • Accommodate special programs such as music, entertainment, x-box tournaments, and movies.
  • Encourage healthy student eating with the understanding that fried chicken day is still the most popular 

Design Overview

The building exterior incorporates brick and precast concrete in a classic Georgian style to be in character with the adjoining buildings. Examples include the tower at the southeast corner of the building that relates to the southwest corner of the adjoining Rodgers Library. Together the two buildings frame views from Hackberry Lane into the Shelby Quadrangle. Selected building elements relate to the nearby buildings in the Shelby Quadrangle, these included the precast building cornice, cast stone base and trim pieces, exterior sconces, and gabled roof elements. These features of the surrounding buildings were combined and reinterpreted so the building completed the setting, tying together two dissimilar design styles seamlessly.

The Fresh Food Company  The Fresh Food Company

Site work included the completion of the pedestrian connection from the Shelby Quadrangle to the corner of Hackberry Lane and Margaret Boulevard; as well as a new pedestrian connection to the Student Union building to the west. A new plaza was formed at the intersection of these paths. The hardscape was accented with raised planters and limestone capped brick walls screening the dining halls loading dock.

The building services, loading dock, and parking were placed to the west in a new back of house area that it shares with the adjoining Hardaway Hall and Engineering Building. Having a clear front and back to the building lowered construction cost while improving building functionality. To ensure pedestrian safety on campus, vehicular circulation was confined to a new one-way alley on the west side of the building. This improves safely by having controlled and monitored deliveries and confines vehicular parking to the rear of the building away from pedestrian pathways.

The Fresh Food CompanyDining Hall

The 25,000 square-foot first floor is devoted to the dining hall and support spac­es. Current operation hours are from 7:00 a.m. to 6:00 p.m., serving up to 1,500 meals during the lunch period. Dining options include seven themed micro-restaurants arranged as an open market. Micro-restaurant themes include Italian, Chef’s Table, Deli, Salad, Home Cooking, Grill, and Dessert. Dining for up to 525 students is arranged around the perimeter in eight distinct seat­ing pockets which vary in their decor, amenities and lighting. These seating areas provide intimacy and allow greater operational flexibility.

Glazed verti­cal lift doors connect the two story atrium at the southeast corner of the dining room to the adjoining outdoor dining areas for a true indoor/outdoor experience. Enclosed in a wrought iron fence, the outdoor dining courtyard overlooks the major pedestrian pathways that flow around the building connecting the Shelby Engineering Quad to the center of campus. The courtyard accommodates seating for an additional 100 students providing both overflow and seasonal dining options. Awnings were included in the design to reduce the scale of the space and support outdoor fans and radiant heaters. These features along with an outdoor fireplace were included to extend the outdoor dining season well into the fall and spring.

The seven micro-restaurants are supported from a central prep kitchen and a dish wash area. Adjoining the prep kitchen are staff offices. The central prep kitchen is directly connected to the central dry good storage rooms, central walk-in freezer, coolers, and the loading dock. This carefully orchestrated room arrangement mirrors the most direct process for handling deliveries and processing of food and supplies, this result in less staff time required to manage the back of house areas.

The mechanical system utilizes the campus hot and chilled water system to minimize utility costs. To maximize the usable area on the ground floor for the dining hall, the majority of the mechanical equipment is located on the second floor. Support spaces on the first floor are limited to janitorial closets, restrooms, pump room, and a main electrical room.

The Fresh Food CompanySecond Floor

The 18,000 square-foot second floor was constructed as a shell/storage space to be finished at some point in the future for classrooms, offices, and banquet dining facilities. To accommodate these future uses a sepa­rate entry with a monumental stairs and elevator provides public access to the second floor. A service elevator provides a direct connection to the prep kitchen below for catering support to the planned banquet rooms.

Design Innovations

A central feature in the design of the building was variety. This variety begins with the seven micro-restaurants. The design team researched, programmed, and designed each micro-restaurant separately so they would relate to the planned menu with the goal of creating a venue identity without signage. These distinct micro-restaurants allows users to feel there is greater variety in dining options, which in turn creates more draw and more repeat customer use during the school year.

The micro-restaurants were thoughtfully located in relationship to the main entry. Meal options such as the Chef’s Table and the Salad Bar were placed closer to the front to encourage healthy food choice while the grill was placed toward the back. This had the added benefit of lowering the pressure on the grill during peak meal service hours.

Coordinated with and built around the micro-restaurants are distinct and separate dining areas. Seating areas range from secluded booths with warm soft lighting to communal tables with vibrant colors, daylighting and views. The result being students simultaneously use the dining hall for multiple purposes from group meetings and small gatherings, to communal dining and fund raising events.

The main entry is located toward the north end of the building. This asymmetry provides distinct advantages to the staff, creating an inherent scalable to the use of the dining facility since breakfast and dinner services are smaller than the noon meal service, they require only a portion of the facility. The staff uses the smaller dining areas located to the left and right of the entry to service these meals. The arrangement of the building screens these areas from closed portions of the dining hall and allows the staff to create a sense of a smaller restaurant using lighting only.

The Fresh Food CompanyOver the life cycle of the facility these distinct themed micro-restaurants and varied dining areas will continue to pay dividends for the University. Because each micro-restaurant is self-sufficient with its own food service equipment and storage, they can be shut down independently with minimal impact to the remainder of the facility. This greatly increases the ability of the facility to deal with repairs or renovations. Because there is a relatively high level of modification and change in the food service sector, it is anticipated this planning will pay for itself several times over during the life of the facility.

Tangible Results

The completed project formally opened with the start of fall classes in August 2014 to great acclaim by the students, faculty and staff. With total annual sales exceeding $5 million the dining hall is quickly paying for itself. The administration often receives requests to utilize the dining rooms for events not contemplated during the programming and has been able to easily accommodate all requests. Currently operating with limited meal service during the morning and evening and only partial occupancy of the second floor; the facility has untapped potential to be an even greater benefit to the University of Alabama. 

Project Description:

1) Control of Institution: Public

Locale:

Urban

Methodology & Standards:

First-Cost; Prototype Design

Funding Method(s):

Primary Source: Primary Source: Private Funding

Project Delivery Method(s):

Design-Bid-Build

Sustainable/Green Design:

Principles Followed: LEED
Site Selection and Development: Site Selection; Building Orientation
Water Conservation: Water Conservation
Energy Efficiency and Conservation: Energy Efficiency; Building Automation/Energy Management Systems; Natural Ventilation
Materials Use: Sustainable Materials Selection
Indoor Environmental Quality: Use of Daylighting; Electric Lighting Systems/Controls
Commissioning: Building/systems have been commissioned

Architect(s):

CMH Architects
John Wood
1800 International Park Drive, Suite 300
Birmingham, AL 35243
205-969-2696
http://www.cmharch.com

Associated Firms and Consultants:

Interior Design: University of Alabama Furniture and Design
Construction/Project Management: Hoar Program Management 
General Contractor: Amason & Associates, Inc.
Structural Engineer: MBA Structural Engineers
Electrical Engineer: Hyde Engineering
Mechanical Engineer: MW/Davis Dumas & Associates
Civil Engineer: McGiffert & Associates
Food Service/Kitchen Consultant: Baker Group
Other: Swett & Associates (Elevator Consultants)

Featured

  • Understanding the Training of School Resource Officers

    SROs are now integral components of nearly every educational system in the country. But instead of being a more passive entity in schools, they have gradually become mentors to students, adding to their support network of teachers, parents, coaches, and other caring adults.

  • University of Florida to Start Construction on New Agricultural, Engineering Building

    The University of Florida in Gainesville, Fla., recently announced that it will soon begin construction on a new academic building for the department of agricultural and biological engineering (ABE), according to a news release. The W.W. Glenn Teaching Building is scheduled to begin construction by the end of 2024 and finish by August 2025, in time for the new academic year.

  • University of Kentucky Receives $2.5M Donation Toward Renovation Project

    The University of Kentucky in Lexington, Ky., recently announced that it has accepted a $2.5-million donation that will transform Pence Hall into the home of the university’s College of Communication and Information, according to a news release.

  • San Diego High School Hits Construction Milestone

    Part of a whole-site modernization project at Mira Mesa High School in San Diego, Calif., recently reached a construction milestone. The final steel beam of the new classroom and student services facility was put into place, completing the building’s structural framework.

Digital Edition