How Rubber Flooring Impacts Costs

From classrooms to hallways, steady foot traffic and heavy rolling loads can quickly compromise a floor’s original beauty and integrity. With pressure to lower operational expenses, many institutions are turning to lifecycle cost analysis (LCCA) to determine which flooring material offers the greatest durability and resilience over the lifetime of the product, and how that directly translates to value and cost savings. Rubber flooring has proven to be a leader in this category. Here’s why.

Installation. The cost of installation (including labor and materials) varies greatly between flooring products. Rubber flooring with a self-adhesive backing can be installed directly over an existing floor. It has fewer seams with less cutting and joint sealing, resulting in faster turn-times, reducing your timeline by up to half.

Durability. The dense surface of rubber flooring can withstand the pressure of heavy loads, dragging desks and chairs, and is resistant to liquid spills and harsh chemicals. This level of ultra-durability is able to support a facility for decades.

Maintenance. Flooring maintenance can account for 75 to 90 percent of total cost over the product’s projected lifespan. Premium rubber flooring has a nonporous surface that repels stains and can be cleaned with little more than water. Unlike other resilient flooring, rubber’s uncoated surface means the floor never needs to be stripped and resealed.

Sustainability. Rubber flooring is naturally sourced and has a low-VOC rating, contributing to a healthier environment and improved indoor air quality (IAQ) for students and staff alike.

Premium rubber flooring has significant impact on total cost of ownership. Using LCCA during flooring specification helps institutions lower expenses long-term while increasing the health and safety of students, faculty, and staff.

This article originally appeared in the College Planning & Management June 2018 issue of Spaces4Learning.

About the Author

Tasha Hughes is a marketing specialist, PR, for nora systems, Inc. (www.nora.com/us). She can be reached at Tasha.hughes@nora.com or 800-332/NORA.

Featured

  • Tennessee District Opens New Central Office

    The Franklin Special District (FSD) in Franklin, Tenn., recently held a ribbon-cutting ceremony for its new 38,400-square-foot Central Office facility, according to a news release. The district partnered with Wold Architects and Engineers to create an administrative space designed to boost productivity, collaboration, and employee wellness.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

  • Greenheck Launches New Series of Rooftop Units

    Air movement, control, and conditioning solutions provider Greenheck recently launched a new line of rooftop units that merge the conveniences of traditional rooftop ventilators and dedicated outdoor air systems, according to a news release. The Model RT controls temperature and humidity for indoor comfort.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

Digital Edition