Wall Heaters

Blustery days with chilling winds can cause heating problems in many facilities with high volumes of foot traffic. While the main rooms within the building may be warm from the primary heating source, many areas are left out in the cold as drafts bring the temperatures down. Vestibules, lobbies, entrance ways, and hallways can see a steady flow of people moving in and out throughout the day, opening doors and letting in chilly air.

In addition to open doors, cold air manages to find its way into facilities by any means necessary—whether it’s through vents, cracks, crevices or unsealed windows. To counteract these cold drafts, facilities should consider fan-forced wall heaters that provide continuous comfort through optimized airflow. Gentle heating sources are often not powerful enough to provide sufficient warmth in drafty areas. Fan-forced wall heaters however, push back on the infiltrating cold air, ensuring occupants feel the warmth as soon as they enter the building and until the moment they leave. These heating units can stop the drafts before they spread throughout a building, bringing down temperatures and reducing overall heating efficiency.

Fan-forced wall heaters with an automatic delay eliminate cold drafts on start-up and discharge residual heat from the heater body during shut down. This helps attack drafts at their source while making the best use of available heat. In addition, consider fan-forced wall heaters that come with an integrated thermostat allowing for easy adjustment of room temperature to maintain a desired comfort level.

As with any heating unit, it is imperative to select high-quality products that offer protection against common safety risks. In terms of general design, fan-forced wall heaters come with a clear, easily accessible power on/off switch for added safety during maintenance.

This article originally appeared in the College Planning & Management October 2019 issue of Spaces4Learning.

About the Author

Andrew Martin is a product manager at Marley Engineered Products (www.marleymep.com), based in Bennettsville, SC.

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • Nonprofit Launches Center to Boost Data-Driven Student Success Strategies

    National nonprofit Complete College America (CCA) recently launched the Center for Leadership, Institutional Metrics, and Best Practices (CLIMB), according to a news release. CLIMB’s ultimate purpose is to help higher-education institutions use data-driven strategies to improve student outcomes by providing tools, frameworks, and support.

  • California High School Debuts $35M Performing Arts Center

    Irvine High School in Irvine, Calif., recently opened its new Performing Arts Center built in partnership with C.W. Driver Companies, according to a news release. The facility cost $35 million and covers about 25,000 square feet.

  • Addressing the Housing Affordability Crisis Through Creative Campus Development

    Many Southern California college and university campuses are living amidst surging housing costs, driving the need to house more of their populations on campus. Especially for community colleges, the need to support millions of unhoused and housing insecure students has become a prominent issue that lawmakers and institutions alike are trying to solve.

Digital Edition