Black Rock Middle School

Spiezle Architectural Group, Inc.

Honorable Mention 2023 Education Design Showcase

Black Rock Middle School

Project Information

Facility Use: Middle School
Project Type: New Construction
Category: Whole Building / Campus Design
Location: Pennsylvania
District/Inst.: Lower Merion School District
Chief Administrator: Megan Shafer, Acting Superintendent
Completion Date: 08/01/2022
Gross Area: 208,300 sq. ft.
Area Per Student: 173.6 sq. ft.
Site Size: 22 acres
Current Enrollment: 1,000
Capacity: 1,200
Cost per Student: $73,876
Cost per Sq. Ft.: $425.59
Total Cost: $88,651,233

Black Rock Middle School

With Lower Merion School District's student population on the rise, the existing schools were reaching maximum capacity. The new Black Rock Middle School alleviates overcrowding at the elementary schools by moving fifth grade out of the elementary buildings and overcrowding at the middle schools by spreading the middle school population among three buildings instead of two.

Black Rock Middle School

The new 215,000 SF school is centered around a two-story "heart" space with a gathering stair that opens onto an educational courtyard overlooked by the media center. Complementary educational spaces include 12 collaborative learning communities, art, science, music, physical education and a state-of-the-art theater designed to provide an innovative learning experience for up to 1,200 students.

Black Rock Middle School

Black Rock Middle School is organized to provide convenient community access from entrances along the south while students have a safe and secure entry from the north. It is "zoned" with the ability to compartmentalize spaces for various educational and community activities. Twelve [12] Learning Communities span amongst three floors, with ease of access to specialty spaces and technology. Each Learning Community is equipped with a variety of spaces for large-group team teaching, small group instruction or student collaboration and breakout. This allows teachers and students the ability to quickly shift between various modes of learning and creates a highly personalized learning experience for every student.

Black Rock Middle School

Black Rock Middle School

Features include a welcoming school "Heart" that connects the lower-level dining hall via a gathering stair — a multi-functional gathering and performance feature. The theater has flexible/retractable seating to accommodate performances with over 600 spectators but can also be divided into 3 smaller spaces for day-to-day use. A second gathering stair connects the 2-story library that bridges over the exterior courtyard. Other specialty learning spaces include a digital lab, tech workshop, student gallery, movement arts & fitness studio and family consumer science labs. Great importance in the design has been placed on mental health and wellness.

Black Rock Middle School

Black Rock Middle School

Architect(s):

Spiezle Architectural Group, Inc.
Scott Downie, AIA, LEED AP
248-703-3681

Featured

  • Addressing the Housing Affordability Crisis Through Creative Campus Development

    Many Southern California college and university campuses are living amidst surging housing costs, driving the need to house more of their populations on campus. Especially for community colleges, the need to support millions of unhoused and housing insecure students has become a prominent issue that lawmakers and institutions alike are trying to solve.

  • Texas District Breaks Ground on New Elementary School

    The Splendora Independent School District (SISD) in Splendora, Texas, recently broke ground on a replacement facility for Greenleaf Elementary School, according to a news release. The district partnered with planning, engineering and program management firm Lockwood, Andrews & Newnam, Inc. (LAN) for the project.

  • Mesa West Capital Provides Loan to Refinance University of Georgia Residence Complex

    Mesa West Capital recently announced that it has provided a $133.9-million, short-term, first mortgage loan to developer LV Collective (“LV”) to refinance a student housing complex near the University of Georgia, according to a news release. Rambler Athens, a 750-bed residence hall adjacent to the campus, was completed in August 2024.

  • Schools In Focus: Talking Campus Security with Mitch McKinley

    Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

Digital Edition